Search

VDA 5 – Mess- und Prüfprozesse (DE)

SKU: 094-001-DE-02-K

Zmień na język niemiecki

Wydanie w niemieckiej wersji językowej

Volume 5 Measurement and control processes
3rd revised edition, June 2021

German language version.

The book is available on the client’s request. The waiting time for delivery is up to 30 business days. The order is associated with an additional transport fee from external warehouse in the amount of 130 PLN net.

The book is available on the client’s request.

299,25  (285,00  netto)

The price has not changed in the last 30 days

Available on back-order

Description

After over a decade, it was time for a thorough revision of the reference manual on the usefulness of measurement and control processes. To achieve better practical applicability of the standard and enhance user understanding of the methodology, the focus was on creating the third edition of the VDA 5 volume, with a new title: „Measurement and Control Processes, Utility, Planning, and Management.” VDA Volume 5 has been completely revised by VDA QMC and updated with guidance on the changes introduced since the 2011 edition. Current changes in standards and technological advancements have been incorporated in this edition (…)

The third edition has added the following aspects:

  • Clarification of concepts and definitions based on VIM and ISO 3534-1
  • Transparency in the process from planning the measurement system to the utility of measurement and control processes
  • Harmonization strategies with AIAG Core Tool MSA (fourth edition)
  • Recommendations regarding orders for measurement systems (e.g., specifications of essential order conditions)
  • Capability of transferring utility evidence
  • Handling inappropriate measurement systems/processes Dealing with small tolerances („Fine Tolerances,” abbreviated as „FT,” FT regulation)
  • Handling insufficient sample size in „measurement system” and „measurement process” studies
  • Dealing with small batches in pre-production and production batch development and production
  • Consideration and evaluation of current utility through stability measurements

The methods of calculating measurement uncertainty have largely remained unchanged, except for adjustments to indicators and linearity calculations. Calculations have been supplemented with small tolerances, one-sided tolerances, and attribute calculation procedures.

[…] A comparison of the titles of old and new chapters of the requirements of the EN ISO 9001 standard indicates significant differences in the handling of monitoring and measurement resources. Previously, the focus was solely on „oversight of monitoring and measuring equipment,” but since 2015, ISO 9001 refers to „resources for monitoring and measurement.” This clearly shows that it is not just about monitoring and measuring equipment but all necessary resources, from spatial conditions to appropriately trained personnel, suitable control measures, measurement equipment with software, to necessary aids and methods that impact the attainment of important and reliable monitoring and measurement results. All of this must correspond to the purpose of product and service conformity, ensuring that only guaranteed quality is delivered to the customer.

German version.

See also:

299,25  (285,00  netto)

Made to order

178,50  (170,00  netto)

Made to order

299,25  (285,00  netto)

Made to order

304,50  (290,00  netto)

Made to order

Wpisz wyszukiwaną frazę

Search